Videos

This is the same Project Manager trying to tell me there had been no Arching that occurred in the electrical panel even though we had provided this picture from our home inspection:
After requesting a trained service technician clean and inspect the HVAC/GEO Thermal unit BOLDS Project Manager attempts to do so but fails to meet expectations and lost screws and created more issues. This was very typical throughout the build.
BOLD dropping Arlo camera into bucket of water – which shorted out later and would no longer charge